LONDON GATEWAY PORT 1London Gateway Port Ltd, the UK’s fastest growing deep-sea container terminal, has gone out to tender with a multi-million pound contract for the design and construction of Berth 4.

London Gateway Port Ltd, the UK’s fastest growing deep-sea container terminal, has gone out to tender with a multi-million pound contract for the design and construction of Berth 4.

LONDON GATEWAY PORT 1The wide-ranging marine construction works tender includes:

  • design and construction of Berth 4
  • 430 m extension of the existing deep-water quay
  • dredging of the berth pocket and approaches
  • earthworks, removal of existing surcharge material and ground improvement
  • 10 on shore stacks to be operated by automated stacking cranes (ASCs),
  • heavy duty pavements and other surfacing
  • surface water drainage
  • hazardous container storage including pipework and holding tanks for contaminated effluent
  • testing and commissioning

DP World, owners of London Gateway Port, is the only terminal operator to provide a choice of two deep water ports in the UK – the other is at Southampton on the south coast.

Members of consortia submitting tenders will be required to become jointly and severally liable for the project.

Time limit for receipt of tenders or requests to participate is 3rd June 2019 – click here to access the tender documentation.

Generate More Business

Increase your sales by targeting Waterbriefing's named readership of over 8000 water industry professionals:

Showcase your Company

Include news about your latest product or technology and receive home page coverage. Click here.

Join our Directory

Make it easy for prospective customers to find out about your services. Click here.

Promote your Story

Make your company news the first story Waterbriefing users see, via our scrolling news feature. Click here.

Place an Advert

Promote your expertise through an online banner ad, with packages to suit every budget. Click here.