UNITED UTILITIES LOGOUnited Utilities has gone out to tender with an AMP8/9 framework contract for ground investigations work worth an estimated £170 million.

United Utilities has gone out to tender with an AMP8/9 framework contract for ground investigations work worth an estimated £170 million.

UNITED UTILITIES LOGO

The water company is looking for contractors to undertake ground Investigations to support AMP8 and AMP9 construction activity (indicative project value £60k-£1.8m) to meet its ongoing regulatory commitments.

The contract is being tendered in three separate Lots.

Lot 1 - Ground Investigation Works (£150 million)

Lot 1 predominately relates to works forUnited Utilities’ ground Investigations programmes to manage ground risk and includes:

  • boreholes, including cable percussive, rotary, sonic etc to investigate ground and groundwater conditions
  • trial pits, window and windowless sampling to investigate ground and groundwater conditions
  • installation of/monitoring a range of geotechnical /geo-environmental instrumentation
  • downhole and surface geophysics
  • cone penetration investigations
  • other in situ testing (pumping tests, down hole and surface tests)
  • geotechnical / geoenvironmental laboratory testing
  • specialist site access arrangements
  • Reporting; including GIR, GDR, Geo-environmental reports, AGS format reporting etc

 

Lot 2 - Offshore Geophysical Services (£5 million)

Lot 2 predominately relates to works for the company’s ground investigations programmes associated with offshore geophysical surveying and includes:

  • Multi beam bathymetry surveys, reduction and analysis, plus ability to create digital thematic mapping and difference charts from past and present electronic data.
  • Magnetometer surveys and associated analysis
  • Sub bottom profiling with interpretation for geophysics and pipe locating
  • Topographic surveys of inter tidal zone
  • Correlation of geophysical surveys results compared to intrusive investigation
  • Stratigraphy and interpretation
  • Reporting, ground section and chart production

 

Lot 3 - Hydrogeological Drilling & Well Services (£15 million)

Lot 3 relates to works forthe company’s ground investigations programmes associated with Hydrogeological services and well drilling and includes:

  • Rotary drilling works (including 500 to 1000mm diameter holes)
  • Well hole development
  • Well hole logging
  • Well maintenance
  • Reporting

 

Initial contract term is 5 years followed by 5 further annual extension options.

United Utilitities is looking to appoint up to 16 contractors to the framework agreement.

Time limit for receipt of tenders or requests to participate is 9 December 2024 - click here to access the tender documentation.

 

Generate More Business

Increase your sales by targeting Waterbriefing's named readership of over 8000 water industry professionals:

Showcase your Company

Include news about your latest product or technology and receive home page coverage. Click here.

Join our Directory

Make it easy for prospective customers to find out about your services. Click here.

Promote your Story

Make your company news the first story Waterbriefing users see, via our scrolling news feature. Click here.

Place an Advert

Promote your expertise through an online banner ad, with packages to suit every budget. Click here.